Bridges, buildings, roads and irrigation works delivered across Nepal since 2045 B.S.
| S.N. | Name of Project | Name of Client | Agreement Date | Completion Date | Total Contract Amount, NRs. (Including VAT) | Total Final Received Amount, NRs. (Including VAT) |
|---|---|---|---|---|---|---|
| 1 | Upgrading/Improvement of Chovar Dakchinkali Section of Balkhu- Dakchinkali Road | Department of Roads Road Improvement and Development Project Directorate Bhaktapur Nagarkot Sipaghat Balkhu Dakchinkali Road Project Battisputali, Kathmandu | 3 Jun 2015 | 24 Oct 2020 | 21,70,19,106.95 | 23,22,62,957.18 |
| 2 | Construction of Municipal Sewerage, River Training, Service Road and Allied Works Ch 0+000 to 2+900 on both sides, from the confluence of Bagmati & Bishnumati River to Upstream, Contract No: BAPIDP-B1/071-72 | High Powered Committee for Integrated Development of the Bagmati Civilization, Guheshwori, Kathmandu | 3 Dec 2015 | 26 Nov 2019 | 67,90,19,291.53 | 86,46,46,068.62 |
| 3 | Upgrading/Improvement of Lamosanghu-Mude Section of Lamosanghu-Tamakoshi-Jiri Road (Ch 0+000 to 25+000) | Department of Roads Road Improvement and Development Project Directorate Bhaktapur Nagarkot Sipaghat Balkhu Dakchinkali Road Project Battisputali, Kathmandu | 3 Jun 2015 | 24 Oct 2020 | 39,26,52,387.87 | 54,25,70,719.31 |
| 4 | Upgrading of Atmaram path (0+000 to 13+005), Contract No: SNRTP-PAR-W-NCB-18.01-UG-070-71 | Infrastructure Development Office, Birgunj, Parsa | 6 Apr 2016 | 6 Jan 2019 | 9,08,41,426.09 | 8,57,17,635.23 |
| 5 | Upgrading & widening of earthen road to double lane carriageway asphalt concrete pavement including construction of side drain, retaining structure etc in Thankot Chitlang Road (ch 1+640 to 3+000), Contract No: TCRP/3371104/074/075-001 | Federal Supervision and Monitoring Office, Thankot-Chitlang Road Project, Kalanki, Kathmandu | 26 Feb 2018 | 16 Sept 2019 | 7,52,99,291.72 | 6,86,51,264.82 |
| 6 | Construction and Rehabilitation (damaged after earthquake) of Araniko Highway, Barhabise-Kodari Sector, Contract No: DROCHT/301801-4/073/74-150 | Road Division Charikot | 24 Apr 2017 | 13 Jun 2018 | 3,49,40,101.89 | 3,18,55,888.29 |
| 7 | Supply and Installation of Steel W – Beam Crash Barrier (Road Safety works) on Tripurasundari (Baitadi) – Satabanjh – Gokuleshwor – Darchula & Khodpe – Bajhang Road, Contract No. RSSD – DOR – W – ICB – 1.1 | Road Safety Support Project, Kupondol Jwagal, Lalitpur | 13 Jul 2015 | 6 Jul 2017 | 8,93,08,309.37 | 9,20,29,529.68 |
| 8 | Supply and Installation of Steel W – Beam Crash Barrier (Road Safety works) on Tallodungeshwor – Jumla Road, Contract No. RSSD – DOR – W – ICB – 1.3 | Road Safety Support Project, Kupondol Jwagal, Lalitpur | 13 Jul 2015 | 30 Jun 2017 | 7,45,45,293.52 | 7,45,45,293.52 |
| 9 | Construction of Guide wall, Gravelling work, Storm Water Drainage and Subgrade Preparation(KLPP), Contract No.Kamerotar – 01/070/071 | KVDA, KLPP, Madhyapur Thimi | 22 Magh 2070 B.S. | 30 Baisakh 2073 B.S. | 36,76,26,923.25 | 36,92,50,750.29 |
| 10 | Strengthening (Asphalt Concrete) of Runway, Taxiway, Apron and other associated works at Taplejung Airport, Suketar,Taplejung, CAAN/AED/TPJ/Asphalt Concrete/070-071/03 | CAAN, Aerodrom Engineering Department, Babarmahal, Kathmandu. | 23 Magh 2070 B.S. | 23 Magh 2074 B.S. | 8,13,65,038.99 | 8,13,65,038.99 |
| 11 | Periodic Maintenance of Mahakali Highway (Syaule Bhalumara Section), Seti Highway(Syaule Korayal Sectiion) an Silgadi Sanfe Road, Silgadhi, Guder Section, Contract No. RSDPAF -W – SYPM – NCB – FWR – Doti – 1B | Babarmahal, Kathmandu. | 15 Jul 2012 | 29 Mar 2015 | 6,82,40,098.47 | 6,82,39,720.48 |
| 12 | Black Top, Drain, Masonry Wall works at Suryabinayak piolot baba Road, Contract No: SAARC/DROBKT/3371494/071/072-001 | 25 Aug 2014 | 14 Jan 2015 | 6,06,52,817.80 | 6,95,32,075.15 | |
| 13 | Rehabilitation, Upgrading and widening of Lainchaur – Maharajgunj – Budanildantha Road, Contract No.KVRIP/3371494/069/070/010 | DRO, KVRIP, Kathmandu | 17 Mar 2013 | Running | 10,81,30,595.32 | 10,81,30,595.32 |
| 14 | Upgrading and Widening of Jadibuti – Pepsi – Manohra Road Improvement works, Contract No.KVRIP/3371494/070/071/001 | DRO, KVRIP, Kathmandu | 27 Jan 2014 | 14 Jun 2016 | 14,30,85,573.30 | 16,54,15,922.33 |
| 15 | Satdobato – Karmanasa Bridge Road, Contract No.131/068/069/149 | DOR,Lalitpur | 11 Jul 2012 | 2 Apr 2014 | 13,82,84,750.90 | 15,17,55,573.56 |
| 16 | Ugrading and Maintenance of Madredhunga – Ghadgabhanjyang – Gorshang – Dansing Road, contract No. RAIDP/W/NCB/NUW – 16.6/RI/068/069 | DTO, Bidur, Nuwakot | 1 Jun 2012 | 30 Nov 2013 | 1,46,58,633.35 | 1,70,30,471.15 |
| 17 | Upgrading Works of Chhinchu – Jajarkot Road under contract No.:RSDPAF-W-UP-ICB-CJ-5C | Chhinchu – Jajarkot Road Project, Babarmahal, Kathmandu | 2 Apr 2012 | 21 May 2014 | 15,15,35,979.81 | 17,42,54,646.20 |
| 18 | Consftruction of Guide wall, Storm Water Drainage and Subgrade Preparation under Kamerotar Land Pooling Project under Contract No.Kamerotar01/068/069 | KVDA, Kamerotar Land Pooling Project, Thimi | 1 Kartik 2069 B.S. | 30 Ashwin 2070 B.S. | 4,95,01,868.47 | 4,93,58,590.00 |
| 19 | Expansion of Sallaghari Byasi Road, Contract No. DROBKT/3371494/10/069/070 | DOR, CRRD, Division Road Office, Bhaktapur | 7 Jestha 2069 B.S. | 6 30 2070 B.S. | 10,73,02,421.35 | 11,65,08,604.31 |
| 20 | Road Construction works at Ganeshchowk – Chiyobhanjyang sector in Panchthar, Contract No. MHH/ES/1 – 12.13&14/068/069 | DOR, Pushpalal Hihgway Project, Eastern Sector, Kathmandu. | 8 Baisakh 2069 B.S. | 3 Ashwin 2070 B.S. | 5,55,01,137.63 | 4,97,17,867.69 |
| 21 | Construction works at Ganeshchowk – Chiyobhanjyang sector in Panchthar, Contract No. MHH/ES/1 – 13/066/067 | DOR, Pushpalal Hihgway Project, Eastern Sector, Kathmandu. | 28 Falgun 2066 B.S. | 30 Poush 2068 B.S. | 1,77,61,282.27 | 1,88,10,621.20 |
| 22 | Strenthening of Runway, Taxiway and Apron under CAAN, Simikot Airport, Humla, contract no.01/Sim/064 – 65/CED/CAAN | CAAN/Humla Airport Project | 14 Nov 2011 | 11,72,13,604.54 | 11,71,75,688.11 | |
| 23 | Phidim – Taplejung Road Project, RCSP/NCB/PT – 02 | DOR, RCSP, Phidim – Taplejung Road Project, Panchthar. | 7 Apr 2009 | 30 Jun 2011 | 7,92,54,123.09 | 8,72,65,832.83 |
| 24 | Periodic Maintenace of Pipalbot – Naubise and Naubise – Simle Road., Contract No. RSDP-FYPM/PNS/NCB-02 | DOR, Rehabilitation Component, Kathmandu | 8 Aug 2009 | 31 Jan 2011 | 5,98,60,801.14 | 6,58,91,642.16 |
| 25 | Periodic Maintenace of Tansen Municipality – Kaligandaki, East – West and Siddhartha (Highway). | DoR, WRRDi, Pokhara | 1 Feb 2010 | 16 Jul 2011 | 4,04,10,696.45 | 3,82,54,035.75 |
| 26 | Access Road and Internal Roads at Bhairahwa EPZ | Special Economic Zone Project | 4 Baisakh 2066 B.S. | 15 Falgun 2066 B.S. | 6,62,96,051.53 | 6,62,96,051.53 |